Thursday, November 03, 2011
Selection of Executive Architect - Expansion of the Birch Aquarium at Scripps, Scripps Earth Exploration Center
Wednesday, May 11, 2011
Request for Executive Architect - Medical Office Building Space OSHPD 3 Conversion, UCSD Medical Center
The University of California, San Diego, will be selecting an Executive Architect to perform design, construction drawings, bid, and construction phase services for an approximately 20,000 GSF conversion of an existing medical office space to OSHPD 3 located on the second floor of an existing medical office building. The approximate total construction cost is estimated at $2,700,000 at CCCI 4842. The project is subject to the campus/university academic and administrative approval process.
Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the Request for Qualifications tab to access the following documents: Request for Qualification package, University Form Attachment B, and a sample Standard Form 330 for your use if you choose to submit a proposal.
Proposals are due no later than 4:00 p.m., Thursday, May 26, 2011.
Final selection and appointment is contingent upon project approval.
For more information: Technical questions or questions regarding the scope of the project should be directed to Gary Wissert, Project Manager, Facilities Design & Construction, gwissert@ucsd.edu. UCSD requests that interested firms refrain from contacting any other party regarding this project
Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its equal employment opportunity policy.
Thursday, September 02, 2010
State of California, Bid - RFQ-Spartan Complex Project
Bid Number 1009-001
Bid Title RFQ-Spartan Complex Project
Bid Start Date Sep 2, 2010 10:17:04 AM PDT
Bid End Date Sep 17, 2010 5:00:00 PM PDT
Standard Disclaimer The State of
websites, including but not limited to Bidsync, and/or other state department links
for modifications to bid documents. The State of
prospective bidder's misunderstanding of the bid solicitation or nonresponsive bid
due to failure to check these websites for updates or amendments to bid documents,
and/or other information regarding the bid solicitations. Failure to periodically check
these websites will be at the bidder's sole risk.
The information published and/or responded to on these websites is public
information. Confidential questions/issues/concerns should be directed to the
contact on the ad.
For more information: Bid Contact Sylvia Sosa sylvia.sosa@sjsu.edu
Thursday, July 08, 2010
RFQ Consulting/Advisory Architect Services
For more information: http://www.aiaeb.org/documents/RFQLowerSproul.pdf
Wednesday, July 07, 2010
prequalification of design-build teams
Project No.: P4L-135/W30096122
Project Type: Pre-Engineered Building
Project Budget: $500,000 to $700,000
Project Completion: December 6, 2010 (Substantial Completion)
Tuesday, June 08, 2010
UCSD Selection of Executive Engineer - East CampusUtility Infrastructure Design
The University of California, San Diego, will be selecting an Executive Engineer to perform design, construction drawings, bid, and construction phase services to construct the utility infrastructure and extend and widen the existing Medical Center Drive on the La Jolla Campus (also known as the “East Campus”) based on the UCSD East Campus Master Infrastructure Plan. The approximate construction cost is estimated $15 -20 million.
Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the Request for Qualifications tab to access the following documents: Request for Qualification package, University Form Attachment B, and a sample Standard Form 330 for your use if you choose to submit a proposal.
Proposals are due no later than 3:30 p.m., Wednesday, June 23, 2010.
Final selection and appointment is contingent upon project approval.
For more information: Technical questions or questions regarding the scope of the project should be directed to Anka Fabian, Principal Civil Engineer, UCSD Facilities Design and Construction, via email at anfabian@ucsd.edu or 858.534.3813 or David Wang, Project Manager, UCSD Facilities Design and Construction, via email at dwang@ucsd.edu or 949.349.2642. UCSD requests that interested firms refrain from contacting any other party regarding this project.
Monday, May 17, 2010
UCSD MedicalCenter Hillcrest Cooling Units Replacement
The University of California, San Diego, will be selecting an Executive Architect to perform the design, construction drawings, bid, and construction phase services to replace old and failing air handling units that service the 2nd Floor ORs in the UCSD Hillcrest Medical Center Facility. These are the existing units S-1, S-18, S-21, S-31 through 35, and S-38.
The approximate construction cost is estimated at just under $3,900,000.
Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the Request for Qualifications tab to access the following documents: Request for Qualification package, University Form Attachment B, and a sample Standard Form 330 for your use if you choose to submit a proposal.
Proposals are due no later than 3:30 p.m., Friday, May 28, 2010.
Final selection and appointment is contingent upon project approval.
For more information: Technical questions or questions regarding the scope of the project should be directed to Avi Grigorescu, AIA, LEED AP, Project Manager at Facilities Design & Construction, via email at agrigorescu@ucsd.edu, telephone number 858.822.6032.
Cafeteria Renovation & Expansion, UCSD Medical Center
The University of California, San Diego, will be selecting an Executive Architect to perform services, prepare construction documents, and to provide bidding and construction support services for the renovation of the existing 4,000 square feet (SF) cafeteria servery and dining room, a 2,000 SF dining room addition, and the renovation of the existing 2,500 SF courtyard patio for outdoor dining at the UCSD Medical Center, Thornton Hospital. The estimated construction cost is $3,000,000 at CCCI 5486. Project is subject to the campus/university academic and administrative approval process.
Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the Request for Qualifications tab to access the following documents: Request for Qualification package, University Form Attachment B, and a sample Standard Form 330 for your use if you choose to submit a proposal.
Proposals are due no later than 4:00 p.m., Tuesday, June 1, 2010.
Final selection and appointment is contingent upon project approval.
For more information: Technical questions or questions regarding the scope of the project should be directed to Scott Pogue, AIA, Principal Architect at Facilities Design & Construction, at 858.534.7858.
Wednesday, May 05, 2010
NOTICE TO INTERESTED DESIGN-BUILD ENTITIES REQUEST FOR QUALIFICATIONS
The new Center will replace the existing center on the same 1.93-acre site at 7501 Schmidt Lane, and provide a high-performing, highly sustainable, and attractive facility that supports waste reduction, reuse, recycling, climate protection and pollution prevention goals for the City. The Center will support the City’s curbside recycling operations, community drop-off of other recyclables, and other environmental programs. The value of the Design/Build Contract will be between $2.5 and $3.0 million.
Submittal Process: The City of El Cerrito will receive, no later than 2:00 PM, May 27, 2010 at 10890 San Pablo Avenue, El Cerrito, CA 94530, a sealed envelope with five (5) copies of the Pre-Qualification Questionnaire for approval to compete for the new Recycling Center and environmental Resource Center to be constructed on the 1.93-acre site of the existing Recycling Center on Schmidt Lane. Only Design/Build Entities with a California Class “A” or “B” General Contractors license and who have been approved through this pre-qualification process will be eligible to compete for the project. All Pre-Qualification Questionnaires shall be made on the form furnished by the City.
Pre-qualification Conference: A non-mandatory Pre-qualification Conference will be held on May 11, 2010 at 2:00 PM at El Cerrito City Hall, 10890 San Pablo Ave, El Cerrito, CA 94530. A tour of the project site will follow at 3:30 PM. Although not required, attendance at the pre-qualification conference is highly recommended for Design/Build Entities attempting to become pre-qualified to compete for this advertised project. Those planning to attend the conference should allow ample time to find a parking space and walk to the meeting location.
For more information:
http://www.el-cerrito.org/business/bids.html
Friday, April 09, 2010
The City of Soledad is requesting Proposals (RFP) for the preparation of an American Disability Act (ADA) transition plan.
The City would like to retain consultants to prepare
Wednesday, February 17, 2010
REQUEST FOR FORMAL PROPOSALS
The Sacramento Metropolitan Fire District is requesting proposals for Architectural and
Engineering Services. A document titled “Request for Formal Proposal (RFFP)
Architectural and Engineering Services for Multiple Projects” contains detailed
information regarding this posting and submission requirements. A copy of this
document can be secured from the following locations:
District Website:
sacmetrofire.ca.gov – Click “For Businesses” on the upper tab on the homepage,
then “Vendors”, then “Bids”.
Administrative Office:
Sacramento Metropolitan Fire District
2101 Hurley Way, Sacramento CA 95825-3208
Attn: Charlotte Tilson, Board Clerk
(916) 566-4099
Proposals shall be submitted by:
Monday March 15, 2010 by 5:00 pm PST.
The Sacramento Metropolitan Fire District intends to award the contract to the most,
responsive, responsible proposals. The Sacramento Metropolitan Fire District reserves
the right to reject any or all bids offered in response to this posting, and either rebid or
take any other action permitted by statute. The District reserves the right to negotiate the
terms and conditions of any final contract for purchase of the item(s) described above.
Friday, January 15, 2010
RFP: CSU Architectural Prequalification
- 2010/2011 CSU Architectural Prequalification Application (.doc)
- 2009/2010 CSU Prequalified Architectural Firms Searchable Database
Trustee policy requires all architectural firms seeking commissions on major capital projects to be prequalified. The CSU Office of the Chancellor has established an annual prequalification process to fulfill this requirement. Prequalification for architectural firms is issued on an annual basis effective July 1st thru June 30th of each year.
- Applying for Prequalification
- 2009/2010 CSU Prequalified Searchable Database
- FAQs
- Working with the CSU
- Campus (staff) Contacts (.xls)
- Campus (consulting) Appointments (.xls)
- Major Capital Outlay Programs
Tuesday, January 12, 2010
UCSD Selection of Project Logistics Coordinator - UCSDEast Campus Health Sciences Projects
The University of California, San Diego, will be selecting a Project Logistics Coordinator (PLC) to perform master scheduling and reporting; site logistics, traffic and parking coordination; utilities and infrastructure support; and program coordination for the East Campus Health Sciences projects that are currently in planning, design, and construction. These projects, with a total budget of over $1 billion, are depicted in Exhibit 1.
The University of California, San Diego (UCSD) Health Care System operates on the La Jolla campus. This medical center currently supports an acute care hospital and a full spectrum of primary and specialty medical and surgical services. In response to consistently growing demand for such services in the northern portion of the City, and San Diego County in general, UCSD intends to expand and renovate the existing facilities at the La Jolla campus (also known as the “East Campus”), primarily by adding inpatient capacity at Thornton Hospital as well as adding supporting research and clinic facilities.
PLC firms wishing to be considered should submit the fully completed Statement of Qualifications, Pre-qualification Questionnaire, Hourly Fee Schedule and 3 to 5 Project Descriptions on a single CD/DVD, all items included on the CD/DVD must PDF files. Level 1 submittals are due to this office no later than 4:30 p.m., Friday, January 29, 2010.
UCSD requests that interested firms refrain from contacting any other party regarding this program. The University of California is an Equal Opportunity Employer. Every effort will be made to ensure that all persons, regardless of race, religion, sex, color, ethnicity, and national origin have equal access to contracts and other business opportunities with the University.
For more information: Technical questions regarding the scope of the program should be directed to James Gillie, Senior Director of Construction Services (858) 534-7303, or Rick Webb, East Campus Program Support (619) 540-6394. Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the RFQ Other Services tab to access the Request for Qualification package.
Tuesday, January 05, 2010
Folger Ranch House Remodel
http://www.openspace.org/news/request_for_proposals.asp
The Midpeninsula Regional Open Space District (District) is pleased to invite qualified architectural design firms to provide professional services for the Folger Ranch House Remodel in unincorporated San Mateo County near the Town of La Honda. This project consists of the design and preparation of bid documents for tenant improvements of a one-story ranch house, approximately 1,900 square feet in size, and the design of a water storage and treatment system for the residence. The purpose of this Request for Proposals is to solicit firms to work with the District and provide the necessary architectural and engineering services for the implementation of this project.
Download the Complete Project Package
Complete project information is contained within the project package, which is available online. Please visit the District's Request for Proposals page <http://openspace.us1.list-manage.com/track/click?u=cf60d90ac20de1d557d559b1e&id=3ac574567c&e=c3272d86ca> to download the entire project package. Proposals are due in the District’s Administrative Office no later than 5:00 p.m. on Thursday, February 4, 2010. Any proposals received after this time will be sent back unopened.
Mandatory Pre-Proposal Site Tour
A mandatory pre-proposal site tour will take place at the project site at 10:00 a.m. on Wednesday, January 20. Please RSVP with Jeannie Buscaglia by January 18 at 5:00 p.m. <mailto:jbuscaglia@openspace.org?subject=RSVP%20Folger%20Ranch%20House%20Site%20Tour> Please see the RFP for more information.
For more information: Please contact Erica Simmons if you have any questions.
Erica Simmons, Project Manager
Midpeninsula Regional Open Space District
esimmons@openspace.org
(650) 691-1200
Wednesday, December 23, 2009
[UCSD RFQ] UCSD Selection of Executive Architect - UCSD MedicalCenter Hillcrest Clinical Laboratory Renovation
The University of California, San Diego, will be selecting an Executive Architect to provide architectural design services (described below) for an approximately 8,000 SF renovation of the Clinical Laboratory department located on the second floor of the existing patient tower at UCSD Medical Center, Hillcrest, located at 200 W. Arbor Drive, San Diego, California. The approximate total construction cost is estimated at $5,500,000 at cost index CCCI 5259. The project is subject to the campus/university academic and administrative approval process.
For more information:Technical questions or questions regarding the scope of the project should be directed to Barbara Anderson, Principal Architect, Facilities Design and Construction, at (858) 534-4907.
Please visit our website at www.fdc.ucsd.edu, select the Design Professionals tab and then the Request for Qualifications tab to access the following documents: Request for Qualification package, University Form Attachment B, and a sample of Standard Form 330 for your use should you decide to submit on this project.
Proposals are due no later than 4:30 p.m., Tuesday, January 19, 2010.
UCSD requests that interested firms refrain from contacting any other party regarding this project.
Every effort will be made to ensure that all persons, regardless of race, religion, sex, color, ethnicity, and national origin have equal access to contracts and other business opportunities with the University.
Tuesday, December 08, 2009
Request for Qualifications (RFQ) For Architect and Engineering Services
The Housing Authority of the County of Santa Clara is soliciting written qualification statements to this Request for Qualifications from prospective firms authorized to do business in the State of California, with experience in architectural design, architectural interiors, mechanical engineering, electrical engineering, geotechnical engineering, structural engineering and asbestos/lead abatement design.
Copy of the RFQ package will be available starting on December 7, 2009 at the address listed below. You can also visit our website www.hacsc.org to download the RFQ package.
Prospective Respondents may request clarification to this RFQ only by submitting a written request via email to rener@hacsc.org with a copy to mariannel@hacsc.org. All questions must be received in writing no later than 5:00PM December 18, 2009.
Proposals must be received no later than 5:00PM January 7, 2010.
Housing Authority of the County of Santa Clara, 100 Great Oaks Blvd, 2nd Floor, San Jose, CA 95119, Attn: Rene Regino.
Wednesday, July 08, 2009
City of Richmond RFP
The City of Richmond is seeking proposals from qualified professionals to prepare a Historic Structure Report and additional materials including a Geotechnical Report, Seismic Evaluation, and Schematic Design Drawings for Rehabilitation of the Riggers Loft Building located at historic former Shipyard 3 in Richmond, California. The purpose of the RFP process is to solicit proposals from qualified consultants who are able to complete the project within the specified time frame. The complete solicitation process for the above referenced RFP will be done through the City’s BidsOnline system. Please register and download the RFP directly from our site to obtain the RFP. This will also ensure that you will receive E-mails and addenda to this solicitation. Please contact Ofelia Alvarez if you have any questions with the registration process.
For more information: See link: http://vendors.planetbids.com/Richmond/biddtl.cfm?BidNo=303&Status=Bidding.
Friday, June 19, 2009
Statements of Qualifications Requested
The Solano County Department of General Services, Division of Architectural Services (DAS), is requesting Statements of Qualifications (SOQ) from qualified firms to provide architectural/engineering services on an as–needed basis to support a variety of existing and future projects primarily through General Services Job Order Contracting (JOC) Program for renovation and tenant improvement projects. The Division of Architectural Services is the primary agency, which provides in-house and/or out sources architectural/engineering services required to successfully deliver capital improvement projects that house County programs and services on behalf of
These projects include a wide variety of new construction, renovation/rehabilitation, tenant improvement, and historic preservation projects. At times, the scale and scope of work assigned to DAS exceeds the capacity of the Division’s work force. Projects, which exceed staff capacity, that require an expedited delivery schedule and/or specialized expertise, are contracted to private consulting firms. The Division, which has eight full–time employees, currently manages over 50 separate projects/work efforts in 2009 with an estimated value in excess of $100 million.
Monday, January 05, 2009
C--A/E Services for Two (2) Outpatient Clinics, 120-Bed Nursing Home Care Unit, Livermore, CA
VA proposes to construct a Ambulatory Care Clinic in the East Bay area containing about 50,000 GSF; a Ambulatory Care Clinic with approximately 108,000 GSF in the Central Valley area collocated with a 120-bed Community Living Center (NHCU) encompassing around 130,000 GSF.
Once a thorough analysis of the users and the facilitys needs has been completed, the scope and method of meeting those needs may change and require a different approach.
Seismic design will adhere to VAs manual for Seismic Design Requirements (H-18-8). Space layout and interior partitioning will meet current VA Space Planning Guidelines and optimize patient care and staff efficiency. Applicants must demonstrate success in sustainable design including prescribing the use of recovered materials, achieving waste reduction, along with water and energy efficiencies in design; and, in addition, the project will comply with the VA Sustainable Design and Energy Reduction Manual. Mechanical, plumbing, electrical, nurse call, medical gases, and fire and safety systems will meet current codes and standards. All structures and utilities will be designed to meet VAs criteria as detailed in its Physical Security Design Manual for VA Facilities, both Life-Safety Protected and Mission Critical Facilities. The space will be in compliance with the Uniform Federal Accessibility Standards (UFAS) and PG-18-13 in all areas. Required services will include preparation of schematics and design development plans, including all appropriate architectural and engineering disciplines, and a firm estimate of construction cost.
The contract will include a government option for: design-build RFP package or construction document preparation; construction period services, and site visits.
The completed project should be capable of achieving LEEDS Silver equivalency.
Only firms, or teams, with in-house architectural services, recent experience in the design of contemporary, state-of-the-art medical facilities similar to that proposed. Additional tasks may include site analysis and selection of potential new locations for the new facilities. Emphasis will be placed on cost and scope management capabilities and previous successful experience with construction and renovations of medical facilities, along with the firms, or teams, Quality Assurance /Quality Control procedures. In addition, the firms or teams must demonstrate their ability to effectively utilize IFC version 2x-3 (or later) compliant parametric Building Information Modeling (BIM) system in developing this project from its initial conception through completion of documentation. The team shall have the experience, ability, and data management skills to execute an integrated design approach using BIM technology. Only architects or architect/engineer firms, or teams, demonstrating the above capabilities and a planned approach to perform contract services will be considered.
In addition to design capabilities, estimating capabilities of the applicants will be considered. An estimate of construction cost based on level of design detail will be required at each design phase. The selected team shall design to the governments estimated cost for construction.
Applicants must have an established working office within roughly 100 mile radius of East Bay and/or Central Valley areas of Northern California, be of sufficient size and experience to accomplish the work, and be licensed in the State of California.
No firm will be considered unless an application consisting of a completed SF 330 Part I and other evidence of experience and capabilities the applicant considers relevant is received by the Office of Construction and Facilities Management, VA Cost Estimating and A/E Evaluation Service (00CFM1B) Attention: Robert T. Smoot, 810 Vermont Avenue, NW, Washington, DC 20420, five (5) copies are required within 30 days of the date of this advertisement.
A current SF 330 Part II, representing and differentiating among the personnel, experience and capabilities of all involved offices, must be included with the application together with current SF 330 Part IIs for each proposed consultants office involved.
Applicants will be rated based on the relevant experience - advance planning and design on projects of similar scale and scope - of both the firm(s) and assigned individuals, the applicants capacity to do the work, record of past performance on VA work, geographic consideration, the participation of minority-owned and women-owned consultants, and demonstrate success in prescribing the use of recovered materials, achieving waste reduction, energy efficiency, and systems integration in facility design. Award of contract is dependent upon the availability of funds. This is not a request for a proposal.
If subcontracting opportunities exist and the submitting firm is not a small business, the small business subcontracting goals will be: (a) 28.7% for Small Business (SB); (b) 5% for Small Disadvantaged Business (SDB); (c) 5% Women-Owned Small Business (WOSB); (d) 3% for Historically Underutilized Business Zone Small Business (HUB Zone); (e) 10% for Veteran-Owned Small Business (VOSB); and (f) 7% for Service-Disabled Veteran-Owned Small Business (SDVOSB). Note: The covenant against contingent fee clause is applicable to this solicitation. ***
For more information:
Points of Contact (POC): Selection Process is Robert T. Smoot, 202-461-8220; POC Scope is Ken Carrico, 707-562-8404
94550
US
202-461-8486
Friday, September 05, 2008
RFQ: San Jose Redevelopment Agency Façade Improvement Program
San Jose Redevelopment Agency Façade Improvement Program
Deadline: September 30, 2008
The San Jose Redevelopment Agency is soliciting Statements of Qualifications from qualified firms or individuals to provide professional architectural design services as part of the Façade Improvement Program for redevelopment areas on an as-needed basis. It is anticipated that the consultant services will be provided for up to a two year period and may be extended if agreed to by all parties. The purpose of the program is to assist business and property owners in designing and constructing façade improvements, including signage, awnings, painting, and other nonstructural elements. In some cases, structural work, major modifications, and historic preservation are undertaken.
Complete RFQ at http://www.sjredevelopment.org/RFQ/ArchRFQ2008.pdf
For more information: http://www.sjredevelopment.org/RFQ/ArchRFQ2008.pdf
